At the “SOCAR Carbamide” plant, through the application of analytical solutions in 2023-2024, improvements in operational capacity and cost reduction have been achieved.
Elchi.az reports with reference to Telegraf that Emil Alkhasli, General Director of “SOCAR Downstream Management” LLC, said this in a statement to journalists.
He noted that during that period, the plant’s production capacity increased by more than 21%:
“In terms of efficiency, the fuel consumption used for the production of each ton of carbamide – natural gas fuel – has been reduced by more than 24%. A number of solutions have been used to achieve this achievement.”